Friday 26 February 2010

3rd day of filming
















A reasonably succesfull day, we managed to get roughly 1 hour of footage which i
sn't enough for a finished product but we are able to return to the location a
nd film more which we will need to do.
The footage we do have is good and can be used to begin editing. There are a few mistakes we made while filming which makes some shots unusable this is because we left some things on the floor which were in shot. another mistake we made was that all the shots were too static and not 'handheld enough'. As very little of this can be used we must return to the location and film far more.

No comments:

Post a Comment